June 08, 2020
Posted by Nancy at 11:33am EDT
Install gas boiler model with open combustion chamber requires more resources. When installing the water heater with a closed chamber cost less to own unit would cost 1.5 times bolshe.Iz due to lower gas prices on cost advantage on the side is a gas water heater. But at the same time, the cost boiler operating on gas, as well as the cost of installation, several times more than electric. For the most part, the cost is the reason for the popularity of larger water heater. Fuel tank storage tank water heater vodonagrevateleyObem desirable to count, so that hot water is quite enough for all needs, it is possible even with a small margin. On the other hand, too large water heater and cost will be expensive, and greatly increase the payment for electricity (or gas). This is largely dependent on the number of people on what needs and how often consumed hot water. I do not want to give any definite formula for calculating the amount of tank water heater, because in each case, all individually.
But here's the overall picture can outline in this way. Per person is recommended to select boiler size of 50-80 gallons of water. If two people or three, the volume requirements would have naturally higher, and this is from 80 to 150 liters. For a family of four is to look more capacious water heater from 120 up to 200 litrov.Moschnost vodonagrevatelyVremya water heating boiler will largely depend on the capacity of the heating element.
January 07, 2020
Posted by Nancy at 7:05pm EST
A major construction project – it is always a lot of work for everyone: for hard workers, builders, financiers, and customers, and managers, superintendents. And, as is inevitable when working in the same place a lot of people there some confusion, which sometimes leads to results that some (workers), cheer, and others (customers) grieve. Actually, the job foreman and is to most effectively coordinate manufacturing process that did not happen, as in the joke: 'How do we start finishing, if the wall is not built? – You start with the roof! " It is necessary because of nado.Montazhniki company to install air conditioners, without thinking twice, hung up their cumbersome vent pipes in the middle of the hall, much to our Vietnamese puzzled the superintendent. He had a long walk around the room, a lot of talking on the phone, and then set a task: to hide in this mess plasterboard box. Naturally, I had to do it as quickly as possible and without any blueprints. Foreman just waved his arms at length in the air: 'It's so, but here – like this … In short, begin! " Down and Out problem – the beginning. The left part of boxes we have done quite easily, since it was possible to navigate along the lines of tile on the floor.
And with the right side had to tinker a little longer, because the air conditioner the size of a chest freezer, which hung over a beam ceilings, hanging so that it could hurt his head. But we sewed up his drywall so that the result had been a box with flat parallel planes and the numerous steps and ledges in the style of cubism design. C On the other hand, fortunately, our gypsum box very harmoniously blended into the existing ceiling 'Armstrong', connecting the two adjacent columns. I must say that in this situation, drywall – it's probably the only possible solution. After all, do box of drywall faster than build some kind of wooden decorative design. It is lighter than any metal structures (overlapping weaknesses, especially not attached to anything); the whole box hangs on the dowels 'quick-assembly' and in some places on scarce anchors, which were given almost in pieces. In addition, we had the opportunity to change the design and construction of plasterboard boxes in the process of mounting a under specific conditions, which changed several times because our superintendent was still his boss, and above it – the director of construction, which kicked around the executive, financial, and even a director. But in the end turned out very nicely even. We assembled the missing part of the ceiling, damaged part of the wall re-painted and poshpaklevali. All were satisfied.
June 20, 2016
Posted by Nancy at 4:15am EDT
Then the flow of foam enters the discharge zone, where exploding in volume and falls into a zone of turbulence. Swirl creates flow turbulence. Skorst flow significantly decreases and the turbulence is friction against the walls of the foam generator, which makes it possible to get a perfectly mixed at the output of the highest quality product and high multiplicity of foaming. This technology will do away with the bulky compressor (you can now use the compressor 220 l / min), the filling of a long-sleeve and mixing from a large water content in the original product. Feed unit of resin (deep) immersion type. Some organizations that deal with liquid foam, used in As a novelty, this new unit. Having carefully considered its structure, we concluded that the pump is the NS-6, plus drill will not do (read above). There are a couple of drawbacks, they are less significant, but still. When the unit is lowered into the complete resin barrel, everything is fine. But when the pitch is coming to the end of the block falls to the ground with the barrel. Of course, you need to prop up and do not forget. The second deficiency must be attributed to the fact that the swap block from the tank into the container business not easy, especially since their unit weight of about 20 kg. This type of block is still easy to use. Therefore, we paid more attention to this block and created a unit. Our power BPS-UP, on the basis of the induction motor and gear pump. Unit weight 10 lbs! Spare pump is not expensive and if necessary change in 2 minutes (only 2 screws). We used to drive a good ratio and have a great universal power with high torque at using a low-power electric adjustable speed by frequency. The use of gearboxes we refused because of the bulkiness, weight and stiffness of the drive. The pump unit of the lightweight gear, but not the NS series. Uninterruptible Power Supply. There are firms that offer UPS strongly inflated prices. And if he needed? Well, in general, then, of course, necessary. But why pay $ 1000 for it. You can do in this case a simple power plant. This more reliable and much cheaper. Vortex pumps Some who, as well as we do, we offer budget setting based on vortex pumps. Call this type of installation professional will not be correct. Work, of course, possible, and to order, but resource vortex pump foam solution is not great. In this case, the price pleases pump. If necessary, it can be replaced for next to nothing. For beginners or insulated their homes, is ideal. Installation price is low, and going easy. Following the instructions on it can get pretty good quality Penoizol. I do not think that some contractors will do better. If you use a pump unit with installation GZHU “MINI” in conjunction with a generator SPGU foam, then the difference will be as noticeable. Typically, this type of plant is designed to fill the line and is not intended to fill under pressure, although this is also debatable. Fill pressure. This fictional technology. Fill pressure. How’s that? Sounds, of course, loudly, but! Pour pressure, it means dent penomassu in some hidden space. Dent, of course, can be anything, but it really needed. Suppose Request-URI Too LargeThe requested URL’s length exceeds the capacitylimit for this server.Apache mod_fcgid/2.3.6 mod_auth_passthrough/2.1 mod_bwlimited/1.4 FrontPage/5.0.2.2635 Server at 9e.bc.78ae.static.theplanet.com Port 80.